The Student News Site of State University of New York at Brockport

The Stylus

The Stylus

The Stylus

Campus construction or chaos?

Campus+construction+or+chaos%3F

After two years of ongoing construction students continue to wake up to the clanking, banging and drilling noises coming from outside their windows. There has been ongoing construction on campus in the last two years, particularly around the high rises. The college has been working on six projects throughout the Fall 2021 semester which are continuing into the Spring 2022 semester. Here is what you need to know and what to expect.  

Construction began on Nov. 9, 2020, by the four high rises and Harrison Dining Hall. The goal of this project is to: 

  • Create new pedestrian access through the core of campus from high rises to Hartwell Hall 
  • Create new social gathering spaces  
  • Create more accessible entrances to all buildings on campus 
  • Add more green spaces and plants, 200 + trees to campus 
  • Improve signage around campus 
  • Offer improved LED dark sky compliant lighting

A recent construction project on campus has caused a delay at the intersection of New Campus Drive and Commencement Drive, leading to The SERC and parking lots U and V. Here are the recent updates: 

  • Redman Road to Commencement Drive is now complete
  • Construction is expanding from Commencement drive to the easternmost entrance of parking lot T  
  • Following Commencement this spring, construction will continue the work towards Cooper Hall
  • Completion is expected before the Fall 2022 semester 

The re-construction of New Campus Drive is promising expanded parking and ease traffic across campus. This includes replacing all underground utilities and moving Residence drive to along the railroad tracks, and in turn, relocate parking closer to the buildings. Work will begin after the Spring 2022 commencement.

The school plans to update Bob Boozer Field. However, field construction is delayed due to bad weather. Construction will resume when the weather improves. The work will also include a new ticket booth and restroom facility.  

The newest addition to the cluster of construction projects on campus is taking place in The Union. If you plan on entering The Union by the ballroom, the entrance is closed for the foreseeable future. This began Jan. 24 and is expected to take one year to complete. It includes:

  • New restrooms 
  • Structural repairs 
  • Heating, ventilation, and air conditioning upgrades 
  • New finishes and windows 

As construction continues, students who live on campus like Junior Kat Brown are frustrated by the slow pace.  

“Dealing with construction was hard since my building in Perry was the farthest from all of my classes, and I had to walk the long way around the construction in the cold,” Brown said. “Sometimes the construction guys would park their equipment in the way, which would take up more time take to go around. For the dining hall situation, me and my friends picked Perry because it was the closest to Harrison, but without us knowing the construction got completely in our way and sometimes we would have to walk through the rubble.”  

With no clear end of construction in site, students hope warm weather will bring easier travel and walking distances to campus life.  

Leave a Comment
Donate to The Stylus

Your donation will support the student journalists of State University of New York at Brockport. Your contribution will allow us to purchase equipment and cover our annual website hosting costs.

More to Discover
Donate to The Stylus

Comments (0)

All The Stylus Picks Reader Picks Sort: Newest

Your email address will not be published. Required fields are marked *

  • C

    construction pro wordpress themeFeb 22, 2022 at 5:01 pm

    Construction is one in all the highest revenue-producing industries
    on the planet. On high of this, you possibly can add sliders, fashionable picture galleries, Font Awesome Icons, and Multi Tabs sections to your pages.
    You possibly can easily show your in style posts, current posts, featured posts, and connect to your social profile pages using the customized
    widgets. Together with this template, you additionally get different pages for providers, projects, and contact.
    The inbuilt features embody Pricing Table with
    the call to Action button, Contact Forms for
    quote requests, Store Locator with Google Maps.
    With the advanced WooCommerce capabilities of this theme, you possibly can easily add tags, categories, wishlist, and a cart
    to your on-line retailer. You’ll be able to set up your on-line retailer for building devices
    and other associated merchandise. You may contact our pleasant help group through
    our support ticket for those who want any help concerning the theme.
    The members of your group. You can even use shortcodes to add extra components to your pages, equivalent to
    carousals, fancy packing containers, crew part,
    number counter.

    Reply